File #: ID19-1179    Version: 1 Name:
Type: Action Item Status: Passed
File created: 1/30/2019 In control: City Council
On agenda: 2/14/2019 Final action: 2/14/2019
Title: Approve a substitution of listed subcontractor for the Headworks Building Odor Control Upgrade Project located at the Fresno/Clovis Regional Wastewater Reclamation Facility (Bid File 3464) (Council District No. 3)
Sponsors: Department of Public Utilities
Attachments: 1. 2019-02-14 Attachment 1 - 48hr Notice to Perform.pdf, 2. 2019-02-14 Attachment 2 - Subcontractor Substitution Request.pdf, 3. 2019-02-14 Attachment 3- Letter from City to US Controls.pdf
REPORT TO THE CITY COUNCIL


February 14, 2019


FROM: MICHAEL CARBAJAL, Director
Department of Public Utilities

THROUGH: DEJAN PAVIC, Supervising Professional Engineer
Department of Public Utilities - Utilities Planning and Engineering

BY: RAUL GONZALEZ, Professional Engineer
Department of Public Utilities - Utilities Planning and Engineering

SUBJECT
Title

Approve a substitution of listed subcontractor for the Headworks Building Odor Control Upgrade Project located at the Fresno/Clovis Regional Wastewater Reclamation Facility (Bid File 3464) (Council District No. 3)

Body
RECOMMENDATION

Staff recommends that City Council approve the request from Hal Hays Construction Inc., (Hal Hays), to substitute U.S. Controls, Inc., and utilize Industrial Electric Company to perform electrical work on the City of Fresno's (City's) Headworks Building Odor Control Upgrade Project (Project) at the Fresno/Clovis Regional Wastewater Reclamation Facility (RWRF).

EXECUTIVE SUMMARY

Hal Hays, the General Contractor on the Project, has requested to substitute U.S. Controls, Inc., who is listed in the bid documents as the subcontractor slated to perform all electrical and communications work on the Project. In accordance with the bid documents, Hal Hays listed U.S. Controls, Inc., as a subcontractor for the electrical and communications portion of the Project because that component of the work exceeds one-half of one percent (0.5%) of the total Project contract amount. During construction, Hal Hays notified the City that their listed subcontractor, U.S. Controls, Inc., failed or refused to complete their written contract. Electrical work performed by U.S. Controls, Inc., was found to be substandard and failed to pass inspection. U.S. Controls, Inc., repeatedly failed or refused to take corrective actions. Hal Hays is asking that they be allowed to substitute Industrial Electric Company in place of U.S. Controls, Inc. This action requires City Council approval be...