File #: ID 25-358    Version: 1 Name:
Type: Action Item Status: Passed
File created: 3/5/2025 In control: City Council
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Approve the First Amendment to the Consultant Services Agreement with Electrical Power Systems, Inc., of Fresno, California, to increase the total contract by an amount not to exceed $57,310.00, paid on a time and materials basis for a revised total contract amount not to exceed $106,760.00, for the Emergency Backup Generators at the B-Side Switchgear and Headworks Buildings at the Fresno-Clovis Regional Wastewater Reclamation Facility Project. (Council District 3)
Sponsors: Capital Projects Department, Department of Public Utilities
Attachments: 1. 25-358 First Amendment to Agreement.pdf, 2. 25-358 Original Consultant Agreement.pdf, 3. 25-358 Original Consultant Agreement-Supplemental.pdf, 4. 25-358 Vicinity Map.pdf, 5. 25-358 Location Map.pdf
REPORT TO THE CITY COUNCIL


FROM: NICHOLAS D MASCIA, PE, Assistant City Manager
Interim Director - Capital Projects Department

BROCK D. BUCHE, PE, PLS, Director
Department of Public Utilities

BY: FRANCISCO V. MAGOS II, PE, Assistant Director
Capital Projects Department, Utilities and On-Site Project Management Division

SAMUEL NADORES, Licensed Professional Engineer
Capital Projects Department, Utilities and On-Site Project Management Division

SUBJECT
Title
Approve the First Amendment to the Consultant Services Agreement with Electrical Power Systems, Inc., of Fresno, California, to increase the total contract by an amount not to exceed $57,310.00, paid on a time and materials basis for a revised total contract amount not to exceed $106,760.00, for the Emergency Backup Generators at the B-Side Switchgear and Headworks Buildings at the Fresno-Clovis Regional Wastewater Reclamation Facility Project. (Council District 3)

Body
RECOMMENDATION

Staff recommends that City Council approve the First Amendment to the Consultant Services Agreement (Agreement) with Electrical Power Systems, Inc. (Consultant), to increase the total contract amount by an amount not to exceed $57,310, for a revised total contract amount not to exceed $106,760, to expand the Consultant's scope of services for the Emergency Backup Generators at the B-Side Switchgear and Headworks Buildings at the Fresno-Clovis Regional Wastewater Reclamation Facility (RWRF) Project (Project); and authorize the Capital Projects Interim Director or designee to sign and execute all documents on behalf of the City of Fresno (City).

EXECUTIVE SUMMARY

On March 2, 2022, the City approved a Consultant Services Agreement with Electrical Power Systems, Inc. to provide engineering design services for the design of plans and general construction documents for the Project. The original scope of services included design for the installation of diesel-fueled emergency generators. After reviewing various f...