File #: ID 22-146    Version: 1 Name:
Type: Action Item Status: Passed
File created: 1/12/2022 In control: City Council
On agenda: 1/27/2022 Final action: 1/27/2022
Title: Actions pertaining to the Tulare Street and Q Street Traffic Signal Project (Council District 3): 1. Adopt a finding of Categorical Exemption per staff determination, pursuant to Section 15301 and 15303 of the California Environmental Quality Act (CEQA) guidelines 2. Approve the Grade Crossing Improvements Agreement with Burlington Northern Santa Fe (BNSF) Railway Company totaling $103,775.00 to facilitate the BNSF grade-crossing and traffic signal pre-emption network and timing improvements for the Tulare Street and Q Street Traffic Signal Project
Sponsors: Public Works Department
Attachments: 1. 22-146 CEQA Environmental Assessment, 2. 22-146 BNSF Grade Crossing Signal and Surface Installation Agreement
REPORT TO THE CITY COUNCIL


FROM: SCOTT L. MOZIER, PE, Director
Public Works Department

BY: RANDALL W. MORRISON, PE, Assistant Director
Public Works Department, Engineering Division

SCOTT P. SEHM, PE, Public Works Manager
Public Works Department, Design Services

SUBJECT
Title
Actions pertaining to the Tulare Street and Q Street Traffic Signal Project (Council District 3):
1. Adopt a finding of Categorical Exemption per staff determination, pursuant to Section 15301 and 15303 of the California Environmental Quality Act (CEQA) guidelines
2. Approve the Grade Crossing Improvements Agreement with Burlington Northern Santa Fe (BNSF) Railway Company totaling $103,775.00 to facilitate the BNSF grade-crossing and traffic signal pre-emption network and timing improvements for the Tulare Street and Q Street Traffic Signal Project

Body
RECOMMENDATION

Staff recommends the City Council adopt a finding of Categorical Exemption pursuant to Section 15301 and 15303 of the CEQA guidelines and approve the Grade Crossing Improvements Agreement with Burlington Northern Santa Fe (BNSF) Railway in the amount of $103,775.00.

EXECUTIVE SUMMARY

The proposed Grade Crossing Improvements Agreement with BNSF Railway is part of the Tulare Street and Q Street Traffic Signal Project already in the construction phase. A previous version of this agreement was approved by Council at the time of the construction contract award, but was then modified by BNSF prior to execution. The revisions to the agreement are immaterial in nature and did not change the cost or scope of the work. These improvements will enhance pedestrian safety along Tulare Street by eliminating the uncontrolled midblock crossing east of the BNSF tracks and installing a signalized crossing west of the tracks at Q Street. The project is locally funded by SB1 Road Maintenance and Rehabilitation Account (RMRA) and Local Transportation Fund for Pedestrian and Bike facilities.

BACKGROUND

The scope of the agr...