REPORT TO THE CITY COUNCIL
June 13, 2019
FROM: SCOTT L. MOZIER, PE, Director
Public Works Department
THROUGH: RANDALL W. MORRISON, PE, Assistant Director
Public Works Department
BY: SHELBY D. MACNAB, MPA, Grants Administrator
Public Works Department
SUBJECT
...Title
RESOLUTION - Authorizing the submission of a grant application for $10,540,582 from the United States Department of Transportation's (USDOT) Better Utilizing Investments to Leverage Development (BUILD) Program for the Veterans Boulevard Interchange, Extension and Grade Separation Project and Authorizing the Execution of All Grant Application Documents by the Public Works Director or Designee (Council District 2)
...Body
RECOMMENDATIONS
Staff recommends that the City Council adopt a resolution authorizing the submission of a grant application for $10,540,582 from the USDOT BUILD Program and authorize the execution of all grant application documents by the Public Works Director or designee.
EXECUTIVE SUMMARY
Staff is requesting authorization to submit a BUILD Program grant application for $10.5 million to fund a portion of Phases Three and Four of the Veterans Boulevard project. Phase Three of the project will construct an interchange at State Route 99 and grade separation over the realigned Golden State Boulevard. Phase Four will extend Veterans Boulevard to connections with Herndon Avenue to the north and Shaw Avenue to the south. A project map is attached to this Staff Report.
BACKGROUND
Veterans Boulevard, originally referred to as the Herndon-Grantland Diagonal, was part of the 1984 General Plan and is a planned six-lane super arterial in the 2035 General Plan. The interchange concept was refined in 1986 with a feasibility study conducted to analyze potential interchange/grade separation configurations. In 1991, a Project Initiation Document was completed, and in 1996, the Official Plan Line for Veterans Boulevard was adopted by the Council. Veterans Boulevard and the propo...
Click here for full text