REPORT TO THE CITY COUNCIL
March 22, 2018
FROM: SCOTT L. MOZIER, PE, Director
Public Works Department
BY: RANDALL W. MORRISON, PE, Assistant Director
Public Works Department, Engineering Division
JASON A. CAMIT, PLS, Chief Surveyor
Public Works Department, Engineering Division - Chief Surveyor Section
SUBJECT
Title
HEARING - To vacate a public water main easement and an emergency access easement south of previously vacated East Hamilton Avenue between South Parallel Avenue and South Third Avenue. (Council District 5)
1. ***RESOLUTION - Ordering the vacation of a public water main easement and an emergency easement south of previously vacated East Hamilton Avenue between South Parallel Avenue and South Third Avenue (Subject to Mayor's veto)
Body
RECOMMENDATION
Staff recommends the City Council conduct the required public hearing and at the close of the hearing, adopt the attached resolution ordering the vacation of a public water main easement and an emergency access easement south of previously vacated East Hamilton Avenue between South Parallel Avenue and South Third Avenue as shown on Exhibits "A" and "B" of the attached resolution.
EXECUTIVE SUMMARY
Lyons Magnus is requesting the vacation of the public water line easement and the emergency access easement, as shown on Exhibits "A" and "B" of the attached Resolution. This vacation is being required as a condition for site plan D-16-011. The existing water line within the proposed water line easement vacation will be converted to a private water line. The emergency access will be relocated to the south side of the site.
BACKGROUND
Lyons-Magnus Fruit Packaging facility located on the west side of South Third Street between East Hamilton and East Woodward Avenues is proposing the demolition of existing buildings totaling 55,855 square feet and construction of a 55,055 square-foot metal warehouse building addition for dry storage of finished product. The project also includes an ...