File #: ID18-0763    Version: 1 Name:
Type: Action Item Status: Passed
File created: 6/5/2018 In control: City Council
On agenda: 7/26/2018 Final action: 7/26/2018
Title: Reject the bid for the Friant Road Median Island Cap Restoration Project - Bid File No. 3560 (Council Districts 2 and 6)
Sponsors: Public Works Department
Attachments: 1. 18-0763 Bid Evaluation.pdf, 2. 18-0763 Vicinity Map.pdf
REPORT TO THE CITY COUNCIL



July 26, 2018



FROM: SCOTT L. MOZIER, PE, Director
Public Works Department

BY: RANDALL W. MORRISON, PE, Assistant Director
Public Works Department, Engineering Division

SCOTT P. SEHM, PE, Public Works Manager
Public Works Department, Design Services Section

ERIC W. JOHNSON, Engineer II
Public Works Department, Design Services Section

SUBJECT
Title
Reject the bid for the Friant Road Median Island Cap Restoration Project - Bid File No. 3560 (Council Districts 2 and 6)

Body
RECOMMENDATION

Staff recommends that the City Council reject the bid submitted by Avison Construction Inc., in the amount of $677,315 for the Friant Road Median Island Cap Restoration Project and direct staff to rebid the project.

EXECUTIVE SUMMARY

The existing Friant Road median islands from Nees Avenue to Fresno Street are currently capped with asphalt. This project proposes to remove the existing median island cap, beautify the median islands with decorative stamped concrete, drought resistant trees, shrubs and ground cover, and install water-efficient irrigation. The existing median curb will not be disturbed and no changes to the roadway geometrics are proposed. This project is located within Council Districts 2 and 6, and enters Caltrans Right of Way.

The only bid submitted on the project was from Avison Construction Inc. in the amount of $677,315. As this amount exceeds the project budget, awarding a contract is not possible; staff recommends that City Council reject the bid for the Friant Road Median Island Cap Restoration Project and direct staff to rebid the project.


BACKGROUND

The Friant Road Median Island Cap Restoration Project was initiated when the project was incorporated in the FY 2017 Capital Budget as adopted by the Council. The Friant Road median island concrete cap represents the only capital improvement which was not completed out of Urban Growth Management (UGM) Major Street Zone "A", with the balance of UG...